Shoprite Distribution Centre
City:
Cape Town
Area:
Brakenfell
Client:
Shoprite
Value:
R27 000 000
Duration:
20 months
Completion:
1 May 2012
Size:
80 000m²
Sector: Specialised & Large Scale
Scope of Work:
- Roof sheeting for the new distribution centre was the first phase.
- The second phase of the work entailed replacing the roof covering at the existing warehouse.
- The cladding around the entire building was re-painted.
- Roof sheeting for the new distribution centre was the first phase.
- The second phase of the work entailed replacing the roof covering at the existing warehouse.
- The cladding around the entire building was re-painted.
Challenges:
In phase 1 the programme had to be completed within a very short time frame. The building construction with monitor for light made handling the sheeting very challenging. Phase 2 had to be carried out without any disruption to the warehouse operations. The building remained operational throughout the contract with no production time lost.
In phase 1 the programme had to be completed within a very short time frame. The building construction with monitor for light made handling the sheeting very challenging. Phase 2 had to be carried out without any disruption to the warehouse operations. The building remained operational throughout the contract with no production time lost.