Shoprite Distribution Centre

City: Cape Town
Area: Brakenfell
Client: Shoprite
Value: R27 000 000
Duration: 20 months
Completion: 1 May 2012
Size: 80 000m²

Scope of Work:
- Roof sheeting for the new distribution centre was the first phase.
- The second phase of the work entailed replacing the roof covering at the existing warehouse.
- The cladding around the entire building was re-painted.

Challenges:
In phase 1 the programme had to be completed within a very short time frame. The building construction with monitor for light made handling the sheeting very challenging. Phase 2 had to be carried out without any disruption to the warehouse operations. The building remained operational throughout the contract with no production time lost.