Tygervalley Shopping Centre

City: Cape Town
Area: Durbanville
Client: Parato & Metropolitan
Value: R35 000 000
Duration: 12 months
Completion: August 2015
Size: 60 000m²

Scope of Work:
– New roof sheeting
– Bulk insulation
– Skylite refurbishment.


Construction of a roof on top of a roof using a Scheltema designed spacer system.

This design was to accommodate the bulk insulation.

Everything was installed without removing any of the existing roof sheeting.

All work had to be carried out without any disruptions to shoppers or tenants.

Bulk insulation and spacer system drastically reduces energy requirements.

The glass used in skylights reduced energy requirements.